Milled legs
     
Check out the medullary ray "flecks"

          
Slot indexing jig    Pre-labeled legs    Cutting leg slots   All leg slots done

             
Raw rail board    Milled rail stock     Final narrow rails  Custom Domino end slotting jig

 
Dry fit legs and narrow rails

             
Glue drawer rail    Milling slat mortises   Dry fit including wide rails and slats

          
Route edge chamfers   Ready for final sanding

                
Sand leg bevels      Final part sanding      Glue
L&R side assemblies
                                      
Re-saw 1/4" veneer   Re-sawn (book-matched) pieces   Glue veneer into sheets    
    
                  
Glue veneer to substrate    Finished Panels
          
Glue center sides   Raw top boards    Milled top pieces   Glue up the top   

    
Center unit back  Center unit front    Glued table top (raw)

     
Dry fit - front            Dry fit - back

          
Cutting dovetails

                 
Drawer glue up
   Drawer infrastructure         Completed drawer unit

 
Front                   Back



 
Randall completed the upholstery and applied the stain and oil/poly.